operator@utcs.utoronto.ca (UTCS Operator) (03/07/91)
7-Mar 09:07 Scheduled maintenance on the Waterloo-Toronto link was
completed at 08:12. The circuit was successfully switched
from Bell to INSINC.
Ray Parker, Network Operations Centre.