perfetti@nic.near.net (05/16/91)
Ticket Number: 1846 Ticket Status: closed
Ticket Type: unplanned Ticket Source: noc
Ticket Scope: network Site/Line: mit1,mit2
Ticket Owner: perfetti Problem Fixer: mit
Ticket Opened: 05/16/91 11:46 Problem Started: 05/16/91 11:37
Closed: 05/16/91 12:51 Ended: 05/16/91 12:30
Close Code: power
Problem Description:
MIT experienced a power hit at the site and this affected
all NSF bound traffic.
Problem Solution:
Power was restored at MIT and egp sessions were restored as
of 12:27 EST. Traffic is now routing through the T3 link.