[ut.nets.reports] Toronto - Western circuit

operator@utcs.utoronto.ca (UTCS Operator) (06/20/91)

20-June 08:30. The cut over of the Toronto-Western traffic to the new
56 kbps circuit was successful.

Sam Pun, Network Operations Centre.

operator@utcs.utoronto.ca (UTCS Operator) (06/21/91)

21-June 11:15 Once again the cut over of the Toronto-Western traffic to 
the new 56 kbps circuit was successful. Bell has repaired the UToronto-
UWestern link.

Sam Pun, Network Operations Centre.