[net.ham-radio] Phase 3B Bulletin #6

karn@eagle.UUCP (06/09/83)

Official AMSAT P3B Bulletin #006
2300 UTC 8 June 83

TO:QST
FM:AMSAT HQ
RLSD:K1HTV

The Washington office of ESA was called today regarding the
upcoming Ariane LO-6 mission and indicated that there was no
change in the earlier released information. The launch of Phase
3-B is still scheduled for 11:59 UTC on Thursday, June 16th 
with the launch window extending until 12:28 UTC. 

Preparations continue for ALINS, The AMSAT Launch Information
Network System . W4OWA has notified AMSAT that arrangements 
have been completed with American Bell for use of their 
conference bridge for ALINS.  A  brief prelaunch test of the 
system will be held at 0000 UTC June 16, about 12 hours before 
the scheduled liftoff.

Jan King, W3GEY, recently back from the Kourou launch site has
indicated that five minute bulletin transmissions originating 
from the 145.81 MHz General Beacon of Phase III-B scheduled for
on the hour and thirty minutes past the hour will only be sent 
in CW in the earlier orbits. RTTY will be added at a later
date. It appears now that in order to reduce battery drain
during the early orbits when the solar panels are not yet 
properly oriented , the 145.987 MHz Engineering beacon will be
kept off most of the time.

In the early phase of the mission, Phase III-B  2 meter 
transmissions will be made on the omni antenna. The effects 
noticed during these early orbits are that downlink signals 
will appear to be at least 10 DB weaker and that more fading 
will be noted on the downlink signals.

More information will follow in the days to come.