All conditions for launch as planned 16 June appear excellent.
 
So reports F8ZS from FY7KRU at the launch facility in Kourou.
Jon reports that all problems with the turbopump lubrication
and the inertial platform have been overcome.
 
A preflight review meeting will be held Tuesday.  If no new
problems are uncovered the countdown will begin Wednesday.
 
The preparations are one full day ahead of schedule now so the
several launch crews are taking the day off from work.
 
Some additional work remains to be done in connection with the
interface between the blockhouse and the station FY7KRU.  The
"interfphone" [intercom] line must be finalized and some
problems with TVI from the HF linear used at the station must
be eliminated, Jon said.
 
In another domain, KA9Q relates that first AOS may occur for
ZS1FE as soon as T+2:30; a full two and one half hours 
earlier than previously reported (cf PreLaunch #001, 002).
The correct time, Phil points out, should be corroborated
by W3GEY who was out of town as this bulletin was composed.
Further detail on this as it becomes available.
[This time refers to when the general beacon will be first commanded
on; it is my understanding that this will be done in time for
AOS at ZS1FE in South Africa at T + 2hours 30 minutes - KA9Q]