karn@eagle.UUCP (Phil Karn) (07/16/83)
Here's a followup to my previous article regarding the separation anomaly on AMSAT Oscar-10 - Phil, KA9Q ------------------------------- A visit to the Washington offices of the European Space Agency today (July 15) produced the following document which many of you have been patiently waiting to see. The text, produced jointly by ESA, Arianespace, CNES and AMSAT, explains what really happened to the AMSAT-OSCAR-10 spacecraft after the separation from the Ariane L6 third stage. It is being posted here with no further editorial comment (at this time). 73, Rich K1HTV -------------------------------------------------------------- ESA/CNES 13 July, 1983 ARIANE LAUNCH L6 ---------------- ORBIT INJECTION OF OSCAR 10 SATELLITE ------------------------------------- The apogee motor firing of (AMSAT) OSCAR 10, the radio amateur satellite launched on the 16th of July, took place during the night of 11 to 12 July and injected the satellite successfully into an intermediate orbit of approximately 3900 km perigee, 35,800 km apogee height and 26 degree inclination. A second and final apogee motor firing is scheduled within the next fortnight. All equipment on bord (sic) of the satellite checked out so far including the main transponder with its antennas is working perfectly. The firing had been delayed by about three weeks since the satellite's attitude and spin rate after separation were not as expected. Indeed, whilst separation and orbital injection of the ECS 1 satellite were perfect the first acquisition of telemetry from the OSCAR 10 satellite five hours after launch indicated that there were gross errors in attitude and spin rate.The satellite authority took rapid and effective action to guarantee the immediate survival of the satellite so that the situation could be analysed and further corrective action taken. During the past weeks the AMSAT project authority has established full control of the satellite and brought it into the correct attitude for a first firing of the restartable liquid propellant apogee motor. In doing so the AMSAT project authority has demonstrated the extraordinary operational flexibility of the design of its satellite and of the people who operate it. Examination of the launcher telemetry has shown that the dual launch system SYLDA had functioned nominally and that the original separation parameters (including satellite attitude and spin) had been correct. This fact has later been confirmed by stored satellite telemetry data. Detailed investigation of both launcher and satellite data indicates with a high degree of probability, that 53 seconds after separation the third stage caught up with the satellite ; this would explain the attitude and spin rate anomalies observed subsequent to separation. This supposition of a physical contact is reinforced by observation of small shocks registered at that time by launcher vibration sensors and by indications that at least one of the satellite's antennas is slightly damaged. The most likely reason that the third stage caught up with the satellite is that the thrust due to programmed venting of the oxygen tank was significantly higher than predicted and annulled the margins taken for setting up the sequence of orientation manoeuvres. Following separation of each satellite, the Ariane 3rd stage performs an attitude and spin change programme which is then followed by a lateral distancing manoeuvres of this stage. This sequence includes opening and closing of the 3rd stage oxygen vent valves to control residual tank pressure and to provide thrust for the distancing manoeuvre. For future launches the higher residual thrust level and additional margins will be taken into account and the sequence of operations will be adjusted accordingly so that this kind of problem will not be encountered again. ---------------------------------------------------------------