David.Black@A.CS.CMU.EDU (01/15/86)
Power on the NE Coridor is still whatever the Pennsy was using. [11kV 25Hz ?]. Both electrification to Boston and converting the power were scrapped when the NEC project started to run heavily over budget. [Major expense in power conversion was reequipping all the m.u. cars that the various transit authorities (MDOT,SEPTA,NJT,MTA/CDOT) run on the corridor.] --Dave