rowen@hpldsla.sid.hp.com (Robert Owen) (04/13/91)
To describe my problem I'll post the problem:
I want to have two cells contain a date in Excel's date format (m/d/yy) and
in the third cell have a formula that calculates days between dates. Like
this:
4/12/91
4/13/91
1
I was able to perform the date calculation, but unable to have the formula
grab the date from another cell without getting an error. I do have the
manual and still I am stymied!
===========================================================================
| Bob Owen | /\ | Bob Owen /hp2300/60 |
| Scientific | /\ \_____________/\_________| rowen@sid.hp.com |
| Instruments | /\ \_________/\____________ | Phone (415) 857-7425 |
| Division |/ \____/\________________ | FAX (415) 852-8011 |
===========================================================================