alb@alice.UUCP (06/24/83)
NASA has just announced that, due to continuing fog and overcast conditions at KSC, the Challenger will land at EAFB at 0957 EDT. The landing at EAFB, which is still fully equipped, will add about 6 days onto the turnaround time for STS-8, putting a late August launch date in doubt. STS-8 is scheduled to launch at 0230 EDT and land also at EAFB in the first night landing for a shuttle.