[net.columbia] Challenger rolled out

rjnoe@ihlts.UUCP (Roger Noe) (09/14/84)

On September 13 space shuttle orbiter vehicle Challenger was rolled out to
launch complex 39-A at Kennedy Space Center in preparation for its early
October launch.  Challenger was rolled out with only two of its three main
engines, while work is being done on the third.  This is not expected to
delay the launch.  Launch for the eight-day mission is expected to be around
October 4.  A rehearsal countdown is scheduled for September 15.
--
Roger Noe			ihnp4!ihlts!rjnoe