[net.columbia] IUS fixed

rjnoe@ihlts.UUCP (Roger Noe) (09/18/84)

Boeing Aerospace Co. announced that the Inertial Upper Stage design has
been fixed.  The IUS was used 17 months ago to deploy TDRS-A, the first
tracking and data relay satellite, into a geosynchronous orbit but there
was a failure in the IUS motor during its burn.  Small maneuvering motors
were employed to get TDRS-A into its intended orbit.  The Air Force will
use an IUS - the most powerful U.S. upper stage - in December to deploy an
undisclosed payload from the shuttle orbiter Challenger.  Another IUS will
be used next February to deploy TDRS-B.
--
Roger Noe			ihnp4!ihlts!rjnoe