[net.columbia] NASA television update

prg@mgweed.UUCP (Phil Gunsul) (08/23/85)

Here is the lastest from NASA on satellite televised events...
NASA TV SCHEDULE



---------------------------------------------------------------------
 51-I TV PLAN VALID AUG 22 1345Z   T1300Z     AUGUST 23 PAGE 01 OF 02
---------------------------------------------------------------------
 EDT    GMT                 OPERATION-EVENT-REMARKS       RESPONSIBLE
-----  -----           ---------------------------------  -----------
                            T MINUS 1 DAY BRIEFINGS
                                AUGUST 23, 1985
                            -----------------------

10:00  14:00           LAUNCH ABORT PROCEDURES FROM JSC    JSC-PAO
                         TOMMY HOLLOWAY - CHIEF, FLIGHT
                           DIRECTOR OFFICE

10:30  14:30           AUSSAT BRIEFING FROM KSC            KSC-PAO
                         MAX CRISP - SPACE SYSTEMS
                           MANAGER, AUSSAT
                         LORNA MILLER - PUBLIC AFFAIRS,
                           AUSSAT

11:00  15:00           ASC-1 BRIEFING FROM KSC             KSC-PAO
                         GEORGE ROBERTS - PRESIDENT, ASC

11:30  15:30           PVTOS BRIEFING FROM KSC             KSC-PAO
                         DR. MARK DEBEE - PRINCIPAL
                           INVESTIGATOR
                         DR. EARL COOK - CO-INVESTIGATOR

                         DR. CHRISTOPHER PODSIADLY -
                           DIRECTOR, RESEARCH SCIENCE
                           LABORATORY, 3M

12:30  16:30           LEASAT-4 DEPLOYMENT BRIEFING        KSC-PAO
                       FROM KSC
                         MARVIN MIXON - VICE-PRESIDENT,
                         GOVERNMENT SYSTEMS, HUGHES
                         COMMUNICATION

13:00  17:00           LEASAT-3 SALVAGE BRIEFING           KSC-PAO
                       FROM KSC/JSC                        JSC-PAO
                         MARVIN MIXON - VICE-PRESIDENT,
                           GOVERNMENT SYSTEMS, HUGHES
                           COMMUNICATION

                         STU GRISSOM - STS PROJECT
                           MANAGER, LEASAT SALVAGE

14:00  18:00           PRE-LAUNCH PRESS BRIEFING FROM KSC  KSC-PAO
                         JESSE MOORE - ASSOCIATE ADMIN.
                           FOR OFFICE OF SPACE FLIGHT
                         ARNOLD ALDRICH - MANAGER, NATL
                           SPACE TRANSPORTATION SYSTEM
---------------------------------------------------------------------

MORE



















---------------------------------------------------------------------
 51-I TV PLAN VALID AUG 22 1345Z   T1300Z     AUGUST 23 PAGE 02 OF 02
---------------------------------------------------------------------
 EDT    GMT                 OPERATION-EVENT-REMARKS       RESPONSIBLE
-----  -----           ---------------------------------  -----------
                         ROBERT SIECK - LAUNCH DIRECTOR
                         LT. SCOTT FUNK - USAF WEATHER
                           OFFICER
---------------------------------------------------------------------

MORE          



















---------------------------------------------------------------------
 51-I TV PLAN VALID AUG 22 1345Z   T1238Z    LAUNCH DAY PAGE 01 OF 01
---------------------------------------------------------------------
 EDT    GMT     MET         OPERATION-EVENT-REMARKS       RESPONSIBLE
-----  -----  -------  ---------------------------------  -----------
08:38  12:38  0:00:00  ----------------------------------
                       -----     LAUNCH OF 51-I     -----
                       -----        FROM KSC        -----
                       -----                        -----
                       ----------------------------------

09:23  13:23  0:00:45  BEGIN OTV LAUNCH VIDEO FROM KSC.    KSC-NF-TV

09:45  13:45  0:01:07  KSC POST LAUNCH PRESS CONFERENCE.   KSC-PAO

13:10  17:10  0:04:32  AOS HAWAII FOR DOWNLINK OF TV01     HOUSTON-TV
                       PAYLOAD BAY VIEWS. (ORBIT 4)

13:30  17:30  0:04:52  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       C. LACEFIELD - FLIGHT DIRECTOR

18:01  22:01  0:09:23  AOS HAWAII FOR DOWNLINK OF TV02     HOUSTON-TV
                       ASC PRE-DEPLOY ACTIVITY. (ORBIT 7)

18:15  22:15  0:09:37  ASC DEPLOY (NOT TELEVISED LIVE)
                       (ORBIT 7)

21:00  01:00  0:12:22  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       B. REEVES - FLIGHT DIRECTOR

21:08  01:08  0:12:30  BEGIN CREW SLEEP PERIOD.
---------------------------------------------------------------------

MORE          



















---------------------------------------------------------------------
 51-I TV PLAN VALID AUG 22 1345Z   T1238Z     AUGUST 25 PAGE 01 OF 01
---------------------------------------------------------------------
 CDT    GMT     MET         OPERATION-EVENT-REMARKS       RESPONSIBLE
-----  -----  -------  ---------------------------------  -----------
04:00  09:00  0:20:22  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       C. KNARR - FLIGHT DIRECTOR

04:08  09:08  0:20:30  CREW WAKE UP.

04:51  09:51  0:21:13  AOS MILA FOR VTR DUMP OF TV03       HOUSTON-TV
                       ASC DEPLOY. (ORBIT 15)

05:10  10:10  0:21:32  BEGIN 8 MIN 40 SEC PLAYBACK OF      JSC-BLDG 8
                       VTR DUMP OF ASC DEPLOY. (MILA)

08:04  13:04  1:00:26  AOS MILA FOR DOWNLINK OF TV02       HOUSTON-TV
                       AUSSAT PRE-DEPLOY ACTIVITY.
                       (ORBIT 17)

08:31  13:31  1:00:53  AUSSAT DEPLOY (NOT TELEVISED LIVE)
                       (ORBIT 17)

08:40  13:40  1:01:02  BEGIN 10 MIN 20 SEC PLAYBACK OF     JSC-BLDG 8
                       AUSSAT PRE-DEPLOY ACTIVITY. (MILA)

11:00  16:00  1:03:22  AOS HAWAII FOR VTR DUMP OF TV02,03  HOUSTON-TV
                       AUSSAT DEPLOY. (ORBIT 19)

11:10  16:10  1:03:32  AOS GOLDSTONE FOR VTR DUMP OF       HOUSTON-TV
                       TV02,03 AUSSAT DEPLOY. (ORBIT 19)

11:18  16:18  1:03:40  AOS MILA FOR VTR DUMP OF TV02,03    HOUS                AUSSAT DEPLOY. (ORBIT 19)

11:30  16:30  1:03:52  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       J. GREENE - FLIGHT DIRECTOR

12:15  17:15  1:04:37  BEGIN 14 MIN 10 SEC PLAYBACK OF     JSC-BLDG 8
                       VTR DUMP OF AUSSAT DEPLOY.
                       (GOLDSTONE AND MILA.)

12:38  17:38  1:05:00  AOS HAWAII FOR DOWNLINK OF          HOUSTON-TV
                       WATER DUMP SURVEY. (ORBIT 20)

18:38  23:38  1:11:00  BEGIN CREW SLEEP PERIOD.
---------------------------------------------------------------------

MORE          



















---------------------------------------------------------------------
 51-I TV PLAN VALID AUG 22 1345Z   T1238Z     AUGUST 26 PAGE 01 OF 01
---------------------------------------------------------------------
 CDT    GMT     MET         OPERATION-EVENT-REMARKS       RESPONSIBLE
-----  -----  -------  ---------------------------------  -----------
02:38  07:38  1:19:00  CREW WAKE UP.

03:00  08:00  1:19:22  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       C. KNARR - FLIGHT DIRECTOR

06:56  11:56  1:23:18  AOS MILA FOR DOWNLINK OF TV02       HOUSTON-TV
                       SYNCOM PRE-DEPLOY ACTIVITIES.
                       (ORBIT 32)

07:10  12:10  1:23:32  BEGIN 8 MIN 50 SEC PLAYBACK OF      JSC-BLDG 8
                       SYNCOM PRE-DEPLOY ACTIVITIES.
                       (MILA)

07:26  12:26  1:23:48  SYNCOM DEPLOY (NOT TELEVISED LIVE)
                       (ORBIT 32)

09:52  14:52  2:02:14  AOS HAWAII FOR VTR DUMP OF          HOUSTON-TV
                       SYNCOM DEPLOY. (ORBIT 34)

10:03  15:03  2:02:25  AOS GOLDSTONE FOR DOWNLINK OF       HOUSTON-TV
                       WATER DUMP SURVEY. (ORBIT 34)

10:11  15:11  2:02:33  AOS TDRS FOR DOWNLINK OF            HOUSTON-TV
                       WATER DUMP SURVEY. (ORBIT 34)

10:30  15:30  2:02:52  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       J. GREENE - FLIGHT DIRECTOR

12:26  17:26  2:04:48  AOS TDRS FOR DOWNLINK OF TV03       HOUSTON-TV
                       MIDDECK ACTIVITIES. (ORBIT 35)

17:08  22:08  2:09:30  BEGIN CREW SLEEP PERIOD.

18:30  23:30  2:10:52  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       B. REEVES - FLIGHT DIRECTOR
---------------------------------------------------------------------

MORE          



















---------------------------------------------------------------------
 51-I TV PLAN VALID AUG 22 1345Z   T1238Z     AUGUST 27 PAGE 01 OF 02
---------------------------------------------------------------------
 CDT    GMT     MET         OPERATION-EVENT-REMARKS       RESPONSIBLE
-----  -----  -------  ---------------------------------  -----------
01:08  06:08  2:17:30  CREW WAKE UP.

02:30  07:30  2:18:52  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       C. KNARR - FLIGHT DIRECTOR

05:35  10:35  2:21:57  AOS TDRS FOR DOWNLINK OF            HOUSTON-TV
                       WATER DUMP SURVEY. (ORBIT 46)

07:07  12:07  2:23:29  AOS HAWAII FOR DOWNLINK OF          HOUSTON-TV
                       SBU AND CABIN CHECKOUT. (ORBIT 48)

07:15  12:15  2:23:37  AOS GOLDSTONE FOR DOWNLINK OF       HOUSTON-TV
                       SBU AND CABIN CHECKOUT. (ORBIT 48)

07:22  12:22  2:23:44  AOS MILA FOR DOWNLINK OF            HOUSTON-TV
                       SBU AND CABIN CHECKOUT. (ORBIT 48)

07:33  12:33  2:23:55  AOS TDRS FOR DOWNLINK OF            HOUSTON-TV
                       SBU AND CABIN CHECKOUT. (ORBIT 48)

08:20  13:20  3:00:42  BEGIN 17 MIN 50 SEC PLAYBACK OF     JSC-BLDG 8
                       SBU AND CABIN CHECKOUT. (ORBIT 48)
                       (GOLDSTONE AND MILA)

09:00  14:00  3:01:22  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       J. GREENE - FLIGHT DIRECTOR

10:20  15:20  3:02:42  AOS HAWAII FOR DOWNLINK OF          HOUSTON-TV
                       SBU AND CABIN CHECKOUT. (ORBIT 50)

10:29  15:29  3:02:51  AOS GOLDSTONE FOR DOWNLINK OF       HOUSTON-TV
                       SBU AND CABIN CHECKOUT. (ORBIT 50)

10:36  15:36  3:02:58  AOS MILA FOR DOWNLINK OF            HOUSTON-TV
                       SBU AND CABIN CHECKOUT. (ORBIT 50)

10:41  15:41  3:03:03  AOS TDRS FOR DOWNLINK OF            HOUSTON-TV
                       SBU AND CABIN CHECKOUT. (ORBIT 50)

11:30  16:30  3:03:52  BEGIN 12 MIN 30 SEC PLAYBACK OF     JSC-BLDG 8
                       SBU AND CABIN CHECKOUT. (ORBIT 50)
                       (GOLDSTONE AND MILA)

16:08  21:08  3:08:30  BEGIN CREW SLEEP PERIOD.
---------------------------------------------------------------------

MORE



















---------------------------------------------------------------------
 51-I TV PLAN VALID AUG 22 1345Z   T1238Z     AUGUST 27 PAGE 02 OF 02
---------------------------------------------------------------------
 CDT    GMT     MET         OPERATION-EVENT-REMARKS       RESPONSIBLE
-----  -----  -------  ---------------------------------  -----------
16:30  21:30  3:08:52  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       B. REEVES - FLIGHT DIRECTOR
---------------------------------------------------------------------

MORE          



















---------------------------------------------------------------------
 51-I TV PLAN VALID AUG 22 1345Z   T1238Z     AUGUST 28 PAGE 01 OF 02
---------------------------------------------------------------------
 CDT    GMT     MET         OPERATION-EVENT-REMARKS       RESPONSIBLE
-----  -----  -------  ---------------------------------  -----------
00:08  05:08  3:16:30  CREW WAKE UP.

00:30  05:30  3:16:52  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       C. KNARR - FLIGHT DIRECTOR

03:24  08:24  3:19:46  AOS TDRS FOR DOWNLINK OF            HOUSTON-TV
                       WATER DUMP SURVEY. (ORBIT 61)

05:58  10:58  3:22:20  AOS HAWAII FOR DOWNLINK OF TV03     HOUSTON-TV
                       MIDDECK ACTIVITIES. (ORBIT 63)

06:02  11:02  3:22:24  AOS GOLDSTONE FOR DOWNLINK OF TV03  HOUSTON-TV
                       MIDDECK ACTIVITIES. (ORBIT 63)

06:08  11:08  3:22:30  AOS MILA FOR DOWNLINK OF TV03       HOUSTON-TV
                       MIDDECK ACTIVITIES. (ORBIT 63)

06:35  11:35  3:22:57  BEGIN 15 MIN 20 SEC PLAYBACK OF     JSC-BLDG 8
                       MIDDECK ACTITIVITES.
                       (GOLDSTONE AND MILA)

08:00  13:00  4:00:22  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       J. GREENE - FLIGHT DIRECTOR

09:09  14:09  4:01:31  AOS HAWAII FOR DOWNLINK OF TV03     HOUSTON-TV
                       MIDDECK ACTIVITIES (EMU CHECKOUT).
                       (ORBIT 65)

09:19  14:19  4:01:41  AOS GOLDSTONE FOR DOWNLINK OF TV03  HOUSTON-TV
                       MIDDECK ACTIVITIES. (EMU CHECKOUT)
                       (ORBIT 65)

09:27  14:27  4:01:49  AOS MILA FOR DOWNLINK OF TV03       HOUSTON-TV
                       MIDDECK ACTIVITIES (EMU CHECKOUT).
                       (ORBIT 65)

09:35  14:35  4:01:57  AOS TDRS FOR DOWNLINK OF TV03       HOUSTON-TV
                       MIDDECK ACTIVITIES (EMU CHECKOUT).
                       (ORBIT 65)

10:30  15:30  4:02:52  BEGIN 15 MIN 50 SEC PLAYBACK OF     JSC-BLDG 8
                       MIDDECK ACTIVITIES (EMU CHECKOUT).
                       (ORBIT 65)
---------------------------------------------------------------------

MORE



















---------------------------------------------------------------------
 51-I TV PLAN VALID AUG 22 1345Z   T1238Z     AUGUST 28 PAGE 02 OF 02
---------------------------------------------------------------------
 CDT    GMT     MET         OPERATION-EVENT-REMARKS       RESPONSIBLE
-----  -----  -------  ---------------------------------  -----------
16:08  21:08  4:08:30  BEGIN CREW SLEEP PERIOD.

16:30  21:30  4:08:52  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       B. REEVES - FLIGHT DIRECTOR
---------------------------------------------------------------------

MORE          



















---------------------------------------------------------------------
 51-I TV PLAN VALID AUG 22 1345Z   T1238Z     AUGUST 29 PAGE 01 OF 01
---------------------------------------------------------------------
 CDT    GMT     MET         OPERATION-EVENT-REMARKS       RESPONSIBLE
-----  -----  -------  ---------------------------------  -----------
00:00  05:00  4:16:22  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       C. KNARR - FLIGHT DIRECTOR

00:08  05:08  4:16:30  CREW WAKE UP.

03:26  08:26  4:19:48  AOS MILA FOR DOWNLINK OF            HOUSTON-TV
                       WATER DUMP SURVEY. (ORBIT 77)

03:34  08:34  4:19:56  AOS TDRS FOR DOWNLINK OF            HOUSTON-TV
                       WATER DUMP SURVEY. (ORBIT 77)

05:03  10:03  4:21:25  POSSIBLE TELEVISION OPPORTUNITY -   HOUSTON-TV
                       PRE-BREATHE OPERATIONS. (ORBIT 78)

05:25  10:25  4:21:47  SATELLITE PLAYBACK OF PRE-BREATHE   JSC-BLDG 8
                       OPERATIONS. (MILA)

08:00  13:00  5:00:22  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       J. GREENE - FLIGHT DIRECTOR

16:00  21:00  5:08:22  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       B. REEVES - FLIGHT DIRECTOR

16:08  21:08  5:08:30  BEGIN CREW SLEEP PERIOD.
---------------------------------------------------------------------

MORE          



















---------------------------------------------------------------------
 51-I TV PLAN VALID AUG 22 1345Z   T1238Z     AUGUST 30 PAGE 01 OF 02
---------------------------------------------------------------------
 CDT    GMT     MET         OPERATION-EVENT-REMARKS       RESPONSIBLE
-----  -----  -------  ---------------------------------  -----------
00:08  05:08  5:16:30  CREW WAKE UP.

00:30  05:30  5:16:52  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       C. KNARR - FLIGHT FIRECTOR.

02:23  07:23  5:18:45  AOS MILA FOR DOWNLINK OF TV08       HOUSTON-TV
                       RENDEZVOUS. (ORBIT 92)

02:45  07:45  5:19:07  BEGIN 8 MIN 30 SEC PLAYBACK OF      JSC-BLDG 8
                       RENDEZVOUS. (ORBIT 92) (MILA)

03:57  08:57  5:20:19  AOS GOLDSTONE FOR DOWNLINK OF TV08  HOUSTON-TV
                       RENDEZVOUS. (ORBIT 93)

04:00  09:00  5:20:22  AOS MILA FOR DOWNLINK OF TV08       HOUSTON-TV
                       RENDEZVOUS. (ORBIT 93)

04:25  09:25  5:20:47  BEGIN 11 MIN 10 SEC PLAYBACK OF     JSC-BLDG 8
                       RENDEZVOUS. (GOLDSTONE AND MILA)

05:19  10:19  5:21:41  AOS HAWAII FOR DOWNLINK OF TV07     HOUSTON-TV
                       EVA PREPARATIONS. (ORBIT 94)

05:26  10:26  5:21:48  AOS GOLDSTONE FOR DOWNLINK OF TV07  HOUSTON-TV
                       EVA PREPARATIONS. (ORBIT 94)

05:34  10:34  5:21:56  AOS MILA FOR DOWNLINK OF TV 07      HOUSTON-TV
                       EVA PREPARATIONS. (ORBIT 94)

06:00  11:00  5:22:22  BEGIN 17 MIN 20 SEC PLAYBACK OF     JSC-BLDG 8
                       EVA PREPARATIONS. (ORBIT 94)

06:57  11:57  5:23:19  AOS HAWAII FOR DOWNLINK OF TV07     HOUSTON-TV
                       EVA PREPARATIONS. (ORBIT 95)

07:07  12:07  5:23:29  AOS GOLDSTONE FOR DOWNLINK OF TV07  HOUSTON-TV
                       EVA PREPARATIONS. (ORBIT 95)

07:16  12:16  5:23:38  AOS MILA FOR DOWNLINK OF TV07       HOUSTON-TV
                       EVA PREPARATIONS. (ORBIT 95)

07:40  12:40  6:00:02  BEGIN 19 MIN 40 SEC PLAYBACK OF     JSC-BLDG 8
                       EVA PREPARATIONS. (ORBIT 95)
                       (GOLDSTONE AND MILA)
---------------------------------------------------------------------

MORE



















---------------------------------------------------------------------
 51-I TV PLAN VALID AUG 22 1345Z   T1238Z     AUGUST 30 PAGE 02 OF 02
---------------------------------------------------------------------
 CDT    GMT     MET         OPERATION-EVENT-REMARKS       RESPONSIBLE
-----  -----  -------  ---------------------------------  -----------
08:34  13:34  6:00:56  AOS HAWAII FOR DOWNLINK OF TV08     HOUSTON-TV
                       EVA. (ORBIT 96)

08:44  13:44  6:01:06  AOS GOLDSTONE FOR DOWNLINK OF TV08  HOUSTON-TV
                       EVA. (ORBIT 96)

08:53  13:53  6:01:15  AOS MILA FOR DOWNLINK OF TV08       HOUSTON-TV
                       EVA. (ORBIT 96)

09:15  14:15  6:01:37  BEGIN 15 MIN 50 SEC PLAYBACK OF     JSC-BLDG 8
                       EVA. (ORBIT 96)

09:30  14:30  6:01:52  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE. (ORBIT 96)
                       J. GREENE - FLIGHT DIRECTOR
                       (MAY BE CANCELLED DUE TO EVA)

10:13  15:13  6:02:35  AOS HAWAII FOR DOWNLINK OF TV08     HOUSTON-TV
                       EVA. (ORBIT 97)

10:23  15:23  6:02:45  AOS GOLDSTONE FOR DOWNLINK OF TV08  HOUSTON-TV
                       EVA. (ORBIT 97)

10:29  15:29  6:02:51  AOS TDRS FOR DOWNLINK OF TV08       HOUSTON-TV
                       EVA. (ORBIT 97)

11:35  16:35  6:03:57  BEGIN 6 MIN PLAYBACK OF EVA.        JSC-BLDG 8
                       (GOLDSTONE)

11:50  16:50  6:04:12  AOS HAWAII FOR DOWNLINK OF TV08     HOUSTON-TV
                       EVA. (ORBIT 98)

12:00  17:00  6:04:22  AOS TDRS FOR DOWNLINK OF TV08       HOUSTON-TV
                       EVA. (ORBIT 98)

13:28  18:28  6:05:50  AOS HAWAII FOR DOWNLINK OF TV08     HOUSTON-TV
                       EVA. (ORBIT 99)

16:38  21:38  6:09:00  BEGIN CREW SLEEP PERIOD.

17:00  22:00  6:09:22  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       B. REEVES - FLIGHT DIRECTOR
---------------------------------------------------------------------

MORE          



















---------------------------------------------------------------------
 51-I TV PLAN VALID AUG 22 1345Z   T1238Z     AUGUST 31 PAGE 01 OF 01
---------------------------------------------------------------------
 CDT    GMT     MET         OPERATION-EVENT-REMARKS       RESPONSIBLE
-----  -----  -------  ---------------------------------  -----------
00:38  05:38  6:17:00  CREW WAKE UP.

01:00  06:00  6:17:22  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       C. KNARR - FLIGHT DIRECTOR

06:03  11:03  6:22:25  AOS TDRS FOR DOWNLINK OF TV05       HOUSTON-TV
                       CREW ACTIVITIES. (ORBIT 110)

09:00  14:00  7:01:22  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       J. GREENE - FLIGHT DIRECTOR

09:10  14:10  7:01:32  AOS HAWAII FOR DOWNLINK OF          HOUSTON-TV
                       WATER DUMP SURVEY. (ORBIT 112)

16:38  21:38  7:09:00  BEGIN CREW SLEEP PERIOD.

17:00  22:00  7:09:22  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       B. REEVES - FLIGHT DIRECTOR
---------------------------------------------------------------------

MORE          



















---------------------------------------------------------------------
 51-I TV PLAN VALID AUG 22 1345Z   T1238Z   LANDING DAY PAGE 01 OF 01
---------------------------------------------------------------------
 PDT    GMT     MET         OPERATION-EVENT-REMARKS       RESPONSIBLE
-----  -----  -------  ---------------------------------  -----------
22:38  05:38  7:17:00  CREW WAKE UP.

23:00  06:00  7:17:22  BEGIN MULTILOCATION CHANGE OF       JSC-PAO
                       SHIFT PRESS CONFERENCE.
                       C. KNARR - FLIGHT DIRECTOR

06:45  13:45  8:01:07  ----------------------------------
                       -----    LANDING OF 51-I     -----
                       -----        AT DFRF         -----
                       -----                        -----
                       ----------------------------------

08:00  15:00  8:02:22  BEGIN POST LANDING PRESS            DFRF-PAO
                       CONFERENCE FROM DFRF.
---------------------------------------------------------------------

MORE          



















---------------------------------------------------------------------
 51-I TV PLAN VALID AUG 22 1345Z   T1331Z   TRANSPONDER PAGE 01 OF 01
---------------------------------------------------------------------
                            OPERATION-EVENT-REMARKS                  
                       ---------------------------------             
                       NASASELECT PROGRAMMING CAN BE
                       ACCESSED THROUGH RCA SATCOM F2R,
                       TRANSPONDER 13.  THE FREQUENCY IS
                       3954.5 MHZ WITH A LOOK ANGLE OF
                       72 DEGREES, WEST LONGITUDE.

                       THIS IS A HALF TRANSPONDER SERVICE
                       ADDITIONALLY, A FULL TRANSPONDER
                       SERVICE WILL BE AVAILABLE ON RCA
                       SATCOM F1R, TRANSPONDER 18.

                       THE FREQUENCY IS 4060.0 MHZ WITH A
                       LOOK ANGLE OF 139 DEGREES, WEST
                       LONGITUDE.  THE TIMES OF THE FULL
                       TRANSPONDER SERVICE ARE LISTED
                       BELOW IN CENTRAL DAYLIGHT TIME.

                         AUGUST 23   12:00 PM TO  2:00 PM
                         AUGUST 24    4:00 AM TO  9:30 PM
                         AUGUST 25    8:00 AM TO  8:30 PM
                         AUGUST 26    7:00 AM TO  7:30 PM
                         AUGUST 27    4:30 AM TO  6:00 PM

                         AUGUST 28    6:00 AM TO  5:00 PM
                         AUGUST 29    5:00 AM TO  5:30 PM
                         AUGUST 30    1:00 AM TO  6:30 PM
                         AUGUST 31    6:00 AM TO  6:00 PM
                         SEPTEMBER 1  5:00 AM TO 12:OO PM
---------------------------------------------------------------------

END OF MESSAGE