[rec.humor.funny] A short dictionary of construction terminology

jrferro@gaak.lcs.mit.edu (Jon R Ferro) (06/28/91)

Found posted in the Physical Planning Office at the Indiana University
of Pennsylvania.  Author unknown.

			Construction Definitions

Contractor - A gambler who never gets to shuffle, cut or deal.

Bid Opening - A poker game in which the losing hand wins.

Bid - A wild guess carried out to two decimal places.

Low Bidder - A contractor who is wondering what he left out.

Engineer's Estimate - The cost of construction in heaven.

Project Manager - The conductor of an orchestra in which every musician
		is in a different union.

Critical Path Method - A management technique for losing your shirt
		under perfect control.

OSHA - A protective coating made by half-baking a mixture of fine print,
		red tape, split hairs and baloney--usually applied at
		random with a shotgun.

Strike - An effort to increase egg production by strangling the chicken.

Delayed Payment - A tourniquet applied at the pockets.

Completion Date - The point at which liquidated damages begin.

Liquidated Damages - A penalty for failing to achieve the impossible.

Auditor - Person who goes in after the war is lost and bayonets the
		wounded.

Lawyer - Person who goes in after the auditors to strip the bodies.
--
Edited by Brad Templeton.  MAIL your jokes (jokes ONLY) to funny@looking.ON.CA

If you mail to original@looking.on.ca, it makes sure that your joke is tagged
as your original work, and thus eligible for the RHF comedy awards.   Always
attribute the source of a joke, whether it's you, or somebody else.