wiechman@athos.rutgers.edu (NightMeower) (05/24/91)
We have just begun to install 7.0 into a rather large Phase 1 network (13 zones, over 300 users/devices) connected primarily with GatorBoxes to a T1 carrier stretching half way across the world. The GatorBoxes are configured for Phase 1 only. My Mac IIx changes back and forth several times a day between 6.0.7 and 7.0 and thus runs Phase 1 and Phase 2. We have yet to see any noticeable problems. Are we encountering problems right now? Should we expect to encounter problems in the future? Should we convert the configurations to Phase 2? What benefits would a conversion have? Thanks in advance, Kevin -- =========================================================================== Kevin S. Wiechmann arpa: wiechman@cs.rutgers.edu This is only a test... for the next sixty seconds...