[comp.sys.sun] Looking for Project Planning & Mgmt Software

jmeissen@cse.ogi.edu (John Meissen) (10/08/90)

The Oregon Advanced Computing Institute (OACIS) is looking for a project
planning and management system with the following capabilities:

1) The ability to specify "Task Work Units".  That is, we want to be able
to specify the time it takes to perform a task in man-months, man-weeks or
some other unit.  Then, depending on how many resources are assined to
that task, the system should automatically adjust the duration of the
task.  MacProject II has this capability.

2) The ability to specify multiple precedence relationships accross sub-
projects.  Suppose I have a hierarchical structure in my project
consisting of multiple levels of sub-projects and tasks.  It may be
required to set precedence relationships between various tasks in
different sub-projects.  SunTrack has this capability.

3) The ability to perform resource leveling with the constraints of the
available resources, including allocating the percentage of time resources
are assigned to tasks.  Suppose I am designing a project in which there
are a number of people constituting a given resource.  I need to have the
system assign these resources to different tasks and possibly allocate the
percentage of time that this resource spends on given tasks.  The object
is to minimize the duration of the project, without exceeding the total
resources allocated for the project.  Presumably, if the desired schedule
cannot be met, more resources can be allocated.

Thanks for any assistance.
Please reply via e-mail.

G. William Walster,
Research Director,
Computation and Algorithms,
OACIS
fuddy@oacis.org