Ninja Master <ninjam@csd4.csd.uwm.edu> (04/25/91)
Just to clear something up, that switching system talked about in Racine, WI (I believe it was an April 12th post), went down because of a leak in the roof. It shorted out the entire system. WiBell and other BOC's have taken note of this, and will be correcting this design flaw in future buildings. Question ... With ANI's, how different will they be with the new POTS CLID hookup, and those generally used with Corps, etc ... are they essentially the same thing? Is there a different software/physical hookup, or what? Thanks.