syswtr@iowasp.physics.uiowa.edu (03/18/91)
I think I saw this go by on this group, but I can't find it to see, so There was a discussion of the peculier operation of the RZ22 in that it needs to be commanded to 'spin-up' after power is applied. This, of course, can make using a spare RZ2x drive in a non-DEC system a bit painful. Does anyone out there know the command required to spin-up the RZ22/RZ23 (i.e. the SCSI command, not the 3100 monitor command) Thanks Bill