[sci.space.shuttle] SRB Status for STS-26

yee@ames.arc.nasa.gov (Peter E. Yee) (10/01/88)

         
         Statement from Royce Mitchell, SRM Project Manager
         
         "I was able to examine both SRB's early this afternoon (Sept 30)
         at Port Canaveral and Cape Canaveral AFS.  There is absolutely no
         sign of any leakage or unusual heating at any of the joints.  All
         three field joints and the case-to-nozzle joints on both boosters
         look very, very good.  The field joint protection system around
         each joint is still in place and looks just like new.  The
         interior of the aft skirts at the case-to-nozzle joints are
         unscorched and look completely normal.  We're looking forward to
         getting the joints apart so we can see how well the new design
         performed in flight."
         
         
         SOURCE:  Royce Mitchell
         PREPARED BY:  Ed Medal, MSFC/PA
         9/30/88