         MSFC STATUS REPORT
         October 9, 1988
         
         FIRST STS-26 SRM SEGMENTS DEMATED
         
         The first STS-26 solid rocket motor segments were demated Sunday
         in Florida and NASA officials said they looked "exceptionally
         good."  The first segment disassembled and inspected was the aft
         of the left hand motor.  Officials reported that there was
         absolutely no evidence of gas pressure to any of the O-rings,
         including the new capture feature O-ring.  That means that the
         bonded J-seal insulation, although not an actual seal, in fact did
         seal the joint.  Both of the other field joints on the left motor
         were also demated Sunday and initial visual inspection of those
         also show no sign of any gas reaching O-rings.  The STS-26 motor
         disassembly process is ahead of schedule and officials believe all
         three field joints of the right motor will be demated tomorrow.
         
         Ed Medal
         MSFC Public Affairs