[sci.space.shuttle] Shuttle Status for 01/04/91

yee@trident.arc.nasa.gov (Peter E. Yee) (01/05/91)

              KSC SHUTTLE STATUS REPORT - FRIDAY, JAN. 4, 1991  10 a.m.


                       STS-39 - DISCOVERY (OV 103) - OPF BAY 1

               The forward reaction control  system  (FRCS)  was  installed
          overnight.  An  interface  test  of the FRCS is planned tomorrow.
          Today,  the payload bay doors are opened and the Ku-band  antenna
          is deployed for checks.

               Engineers are evaluating a problem with the pilot's attitude
          director  indicator  (ADI),  a navigation aid that gives the crew
          information about the orbiter's attitude in terms of  pitch,  yaw
          and roll. Exhaust  ducts  of the three auxiliary power units were
          tested and the data are being evaluated.

               This  weekend,  the  crossfeed  lines  between  the  orbital
          maneuvering system pods are scheduled to be connected.

               Discovery  is being prepared for rollover to the Vehicle As-
          sembly Building the end of this month.

                       STS-37 - ATLANTIS (OV 104) - OPF BAY 2

               Atlantis is powered up today  for  routine  tests.  The  new
          general  purpose  computers  are  being installed in the orbiter.
          Connections of the number 3 auxiliary power unit are  continuing.
          The remote manipulator system is at the OPF and remains scheduled
          for installation this weekend. Instrumentation is being installed
          for the flutter buffet modification.    Atlantis is being readied
          for launch scheduled in April.

                          STS-35 - COLUMBIA (OV 102) - VAB

               Technicians removed the sleep stations from Columbia's  crew
          cabin yesterday. Tiles are being waterproofed and post-flight in-
          spections  in  the  aft compartment are beginning.  Columbia will
          remain in the Vehicle Assembly Building until Discovery is  ready
          to be transferred out of the OPF later this month.

                         STS-37 SOLID ROCKET BOOSTERS - VAB

               Booster  stacking  operations  are continuing.  The left aft
          center segment is being mated to the left  booster  today.    The
          left  forward  center segment is scheduled to be mated early next
          week.

               Technicians are aligning the  new  17-inch  liquid  hydrogen
          disconnect in the proper position on the external tank.