dare@bcsfse.boeing.com (Larry Dare) (04/30/91)
I am currently planning an Oracle migration from version 5 to version
6 with TPO. Our migration is planned in phases, (see description that
follows).
I am interested in hearing from anyone who has done a v5 to v6
migration of an application with extensive user exits, and hear about
any of the problems that happened, it doesn't matter about the exact
environment.
Current Environment:
Apollo workstations using SQL*FORMS 2.0 and SR 9.7 with extensive user
exits. The database resides on a Sequent.
Phase 1 migration:
Migrate the backend database from V5 to V6, leaving the front end
processes being compiled with PRO*C 1.1 and SR 9.7.
Phase 2 migration:
Migrate some of the critical functions that operate in the background
on the Apollo rings to SR 10.3 and PRO*C 1.3
Phase 3 migration:
Migrate the application workstations to SR 10.3 and SQL*FORMS 2.3/
thanks.
Larry S. Dare Ph: (206) 865-5962
!uunet!bcstec!bcsfse!dare
dare@bcsfse.boeing.com
"...the secret is to bang the rocks together, guys"
--
Larry S. Dare Ph: (206) 865-5962
!uunet!bcstec!bcsfse!dare
dare@bcsfse.boeing.com
"...the secret is to bang the rocks together, guys"rsb@ptolemy.ACA.MCC.COM (Richard S. Brice) (05/02/91)
Speaking of Oracle migration, has anyone succeeded in migrating a database to the Oracle-on-an-NCUBE platform? Or does that system exist yet for public consumption?