[news.config] 31 March-5 April, Keele University off air

jonathan@cs.keele.ac.uk (Jonathan Knight) (03/12/89)

Keele University Computer Centre are modifying the computer room and
are shutting off the power on March 31.  "If there are no problems" the
power will be on again on April 5.  They are shutting down the campus
network so that even machines which are not in the computer room
will not be able to access JANET.

The following NRS registered JANET domain names will not answer
between those dates.  Read these backwards if your not in the UK.

Long-name		Short-name
======================= ==================
uk.ac.keele.cc.mvax1	uk.ac.kl.cc.mvax1
uk.ac.keele.cs.derek	uk.ac.kl.cs.derek
uk.ac.keele.cs.zarick	uk.ac.kl.cs.zarick
uk.ac.keele.cs		uk.ac.kl.cs
uk.ac.keele.gec		uk.ac.kl.gec
uk.ac.keele.ph.starlink	uk.ac.kl.ph.star
uk.ac.keele.ph.vax1	uk.ac.kl.ph.vax1
uk.ac.keele.seq1	uk.ac.kl.seq1
uk.ac.keele		uk.ac.kl

The following UUCP name will not respond between the above dates

kl-cs

Seeing as the time that the power is off is likely to be enough to convince
most mail programs to bounce the mail, you should avoid sending mail to
us between March 31 and April 5.

People who still use uk.ac.kl.gec should note that the GEC system is
gradually being shipped out in a skip and will disapear altogether by
March 17.


-- 
  ______    JANET :jonathan@uk.ac.keele.cs     Jonathan Knight,
    /       BITNET:jonathan%cs.kl.ac.uk@ukacrl Department of Computer Science