void@rena.dit.co.jp (Youichi Kusakabe) (11/29/89)
Hello!
I think....
this patch is needed for correct 'day of week' on MS-DOS.
(after Aug. 16 1989)
cal_mjd.c
100c100
< *dow = ((int)floor(mjd-.5) + 1) % 7; /* 1/1/1900 (mjd 0.5) is a Monday*/
---
> *dow = ((unsigned int)floor(mjd-.5) + 1) % 7; /* 1/1/1900 (mjd 0.5) is a Monday*/
------------------------------------------------------
Youichi Kusakabe
void%rena.dit.junet@uunet.uu.net
dit Corp. 3-3-12 Iidabashi Chiyoda-ku Tokyo JAPAN 102
------------------------------------------------------