We have a 9000-635SV on order, and there is some disagreement as to
where to locate the beast when it arrives.  The sales literature
suggests that the machine is appropriate for the general office
environment.  Our CE suggests (VERY STRONGLY) that it belongs in the
computer room.  Being as our machine room is PACKED, and will take
much effort to free up floor space, I'm looking for other opinions
(and experience, if possible) as to whether this is necessary.  (This
is in terms of power supply, size, noise, and heat generation.
 Thanks for any info.

rer@hpfcdc.HP.COM (Rob Robason) (05/03/91)

/ hpfcdc:comp.sys.hp / ostroff@aramis.rutgers.edu (Jack H. Ostroff) /  7:38 pm  Apr 15, 1991 /

We have a 9000-635SV on order, and there is some disagreement as to
where to locate the beast when it arrives.  The sales literature
suggests that the machine is appropriate for the general office
environment.  Our CE suggests (VERY STRONGLY) that it belongs in the
computer room.  Being as our machine room is PACKED, and will take
much effort to free up floor space, I'm looking for other opinions
(and experience, if possible) as to whether this is necessary.  (This
is in terms of power supply, size, noise, and heat generation.
 Thanks for any info.
----------