jlh@loral.UUCP (08/22/84)
Here at work we have lots of equipment for each development station, including CRT's, disk drives, slave emulators, o'scopes, test beds, microcode development stations, etc. Currently we are stacking equipment on top of each other, and due to weight and heat factors we are forced to spread it around a lot, taking up lots of table space. 4 feet or so above the ground we have lots of empty space, with nothing there but blank walls to stare at. Does anyone know of anyone who makes furniture that will allow us to use this space by stacking the equipment vertically, instead of horizontally? How have other companies solved this problem? Any help would be appreciated. Jim Harkins Loral Instrumentation 8401 Aero Dr San Diego, CA 92123 (619) 560-6260 x4636 {ucbvax, ittvax!dcdwest}!sdcsvax!sdccsu3!loral!jlh