[net.wanted] Software for PERT charts and Project Management wanted

ken@turtlevax.UUCP (Ken Turkowski) (12/20/85)

I am looking for software to manage projects:  i.e. given a number of
subtasks< time estimates for their completion, and a parallel/serial
ordering between them, compute the expected time of completion for the
entire task.  It should be able to accommodate several people, each of
which can be working on several interrelated projects.

We have tried MacProject, but it isn't smart enough to realize that
parallel tasks performed by the same person require an amount of time
that is the sum of the two times, not the maximum.

It would be nice to have something with graphical output, but this
isn't necessary, as long as enough information is generated to
construct a graph.

Either source or binary running on a Vax with 4.3bsd UNIX or a PC like
the MacIntosh or IBM would be acceptable.
-- 
Ken Turkowski @ CIMLINC, Menlo Park, CA
UUCP: {amd,decwrl,hplabs,seismo,spar}!turtlevax!ken
ARPA: turtlevax!ken@DECWRL.DEC.COM