hurleym@ul.ie (03/13/90)
I was wondering if anybody out there (in the big bad world), has done, or had anything to do with the following, The Developement of an Expert System for Scheduling and Controlling Flexible Manufacturing Systems. I propose to write the software in Turbo PROLOG, so if anyone reading this has good references and/or good algorithms, I would be more than grateful if you would forward them to me. Thanks, Martin.