[sci.astro] HST transport schedule

sims@stsci.EDU (Jim Sims) (05/31/89)

Some current schedule item based on a preliminary LMSC schedule:


7/10  HST Horizontal - SMA Staking

10/18 Ship HST and GSE

10/22 Install PCS Simulator

11/27 - 12/21  Funct test, GST 8

1/11  Remove GSE cables

2/28 - 3/9 Move to PAD

3/26 - launch?


-- 
    Jim Sims      Space Telescope Science Institute      Baltimore, MD
             UUCP:  {arizona,decvax,hao,ihnp4}!noao!stsci!sims
    ARPA:  sims@stsci.edu                           SPAM:  SCIVAX::SIMS

pdbain@bnr-public.uucp (Peter Bain) (06/01/89)

In article <576@stsci.edu> sims@stsci.EDU (Jim Sims) writes:
>Some current schedule item based on a preliminary LMSC schedule:
>7/10  HST Horizontal - SMA Staking
>10/18 Ship HST and GSE
>10/22 Install PCS Simulator
>11/27 - 12/21  Funct test, GST 8
>1/11  Remove GSE cables
>2/28 - 3/9 Move to PAD
Can you say "acronym overload"?  Jim, could you give us this in
English?  Thanks
         -peter

sims@stsci.EDU (Jim Sims) (06/03/89)

In article <541@bnr-fos.UUCP>, pdbain@bnr-public.uucp (Peter Bain) writes:
> >Some current schedule item based on a preliminary LMSC schedule:
> >7/10  HST Horizontal - SMA Staking
> >10/18 Ship HST and GSE             Hubble Space Telescope
> >10/22 Install PCS Simulator        Pointing Control System
> >11/27 - 12/21  Funct test, GST 8   Ground System Test
> >1/11  Remove GSE cables
> >2/28 - 3/9 Move to PAD                (launch pad!!!!!!)

> Can you say "acronym overload"?  Jim, could you give us this in
> English?  Thanks
>          -peter

Even I don't know what all of em are....  (GSE)
-- 
    Jim Sims      Space Telescope Science Institute      Baltimore, MD
             UUCP:  {arizona,decvax,hao,ihnp4}!noao!stsci!sims
    ARPA:  sims@stsci.edu                           SPAM:  SCIVAX::SIMS

bill@ut-emx.UUCP (Bill Jefferys) (06/04/89)

In article <582@stsci.edu> sims@stsci.EDU (Jim Sims) writes:
#In article <541@bnr-fos.UUCP>, pdbain@bnr-public.uucp (Peter Bain) writes:
#> >Some current schedule item based on a preliminary LMSC schedule:
#> >7/10  HST Horizontal - SMA Staking
#> >10/18 Ship HST and GSE             Hubble Space Telescope
#> >10/22 Install PCS Simulator        Pointing Control System
#> >11/27 - 12/21  Funct test, GST 8   Ground System Test
#> >1/11  Remove GSE cables
#> >2/28 - 3/9 Move to PAD                (launch pad!!!!!!)
#
#> Can you say "acronym overload"?  Jim, could you give us this in
#> English?  Thanks
#>          -peter
#
#Even I don't know what all of em are....  (GSE)

Ground Support Equipment.

jwp@larry.sal.wisc.edu (Jeffrey W Percival) (06/05/89)

In article <541@bnr-fos.UUCP>, pdbain@bnr-public.uucp (Peter Bain) writes:
> >7/10  HST Horizontal - SMA Staking


Secondary Mirror Assembly.
-- 
Jeff Percival (jwp@larry.sal.wisc.edu)