yee@trident.arc.nasa.gov (Peter E. Yee) (12/21/89)
Daily Status/KSC Payload Management and Operations 12-20-89 - STS-31R HST (at VPF) - Began yesterday with construction of "wasp tent" to support Wide Field Planetary Camera (WF/PC) installation. WF/PC installation is planned for today. The every four hour wasp inspection of the VPF highbay is continuing and will work through the holiday week to ensure the problem has been resolved prior to picking up with HST operations in January. - STS-32R SYNCOM (at Pad A) - Battery conditioning will continue through 23 December and will pick back up again on 29 December. - STS-35 ASTRO-1/BBXRT (at O&C) - Software validation continues. ASTRO-1 was successfully moved from test stand 3 to cite test stand four. There were no problems encountered during the move. Access platforms are being installed followed by the cabling configuring of ASTRO-1 for cite testing. - STS-40 SLS-1 (at O&C) - Rack pyrell foam replacement worked yesterday. Rack 7 upper mods, rack 9, 11, & 13 front mods were worked yesterday. Module pyrell foam replacement continues. - STS-42 IML (at O&C) - No activity. Plan to pick up with rack mod work and staging today.