[ca.news] LLNL systems off the air temporarily

mcb@eris.berkeley.edu (Michael C. Berch) (07/02/88)

Due to a major electrical system problem at Lawrence Livermore
National Laboratory, all systems there are presently either down or
off the network.  This affects the news/mail hosts lll-tis, lll-crg,
lll-lcc, lll-winken, lll-ncis, and the gateway from the Internet
to the site-wide backbone network.

The Laboratory is closed today (7/1) to deal with the problem;
however, there is a chance that the systems will be down for the
entire holiday weekend because the support staff may not have site
access to get them rebooted, etc.

All mail sent to or through LLNL should be re-sent early next week
if it got bounced for non-delivery; news feeds to downstream sites
will resume as soon as possible.

We don't have any more information, but will post a followup when more
is known.  Sorry for the inconvenience.

Michael C. Berch
News/mail admin, lll-tis systems (tis.llnl.gov)
(normally) mcb@tis.llnl.gov / ames!lll-tis!mcb
(can be reached at) mcb@mica.berkeley.edu (mcb%mica@berkeley.edu)