gordon@warwick.UUCP (Gordon Joly) (05/09/86)
Thanks to all who pointed out that the basic construction of the hardware would take 9 months, and for an analysis of the cost. I believe that there is a blueprint in existence, with synopsis of "23+23=46". The question of time to the completion of a design still remains open. Gordon Joly -- {seismo,ucbvax,decvax}!mcvax!ukc!warwick!gordon