[net.rec.nude] Update on Bell VAX

coggs@sunybcs.UUCP (Robert Coggeshall) (11/10/83)

 The replacement power controller board will not be in until Friday. After
then, DEC must run acceptance tests for a minimum of 16 hours. 

This means the mahine will not be available to UNIX users until Saturday.
There is little chance that this estimate will slip, The machine is up,
running tests, and everything looks optimistic.


..coggs

jdb@qubix.UUCP (Jeff Bulf) (11/11/83)

*
*
Wazzis have to do with rec.nude? Did I miss something?

		Dr Memory
		decwrl!qubix!jdb

robison@eosp1.UUCP (Tobias D. Robison) (11/13/83)

In case anybody is wondering, this is a stripped down, bare
replacement power controller board.
				- Keremath,  care of:
				  Robison
			          decvax!ittvax!eosp1
				  or:   allegra!eosp1