[net.ai] Parallel production systems.

LERNER@COLUMBIA-20.ARPA (10/17/83)

From:  Mark D. Lerner <LERNER@COLUMBIA-20.ARPA>


The parallel production  system interpreter is  running
on the 15 node DADO prototype. We can presently run  up
to 32 productions, with 12 clauses in each  production.
The prototype has been operational since April 1983.